Completed Projects

Ice Plant in Consuelo

Started Date: Sept 2019

Completion:  December 2019

Progress

Project Description

Converted an existing warehouse into an Ice Plant. In order to utlize the property properly, we constructed a water collection system, two cisterns and three tanks. The water collection system serves as the primary source of clean water which will further undergo different levels of filtration prior to processing in the ice machine which has a capacity to product 10 tons of ice daily.

Swimming Pool, private residence in General Luna

Started Date: Sept 2019

Completion:  February 2020

What3Words Location: ///ravenously.example.replaces

 

Progress

Project Description

A small 20 sqm pool with a concrete finish and PVC decking with an outdoor shower. Completed in 2 months.

Cabitoonan

Started Date: May 2019

Completion: November 2019

Completed

Project Description

A 156sqm Villa with loft situated in Brgy. Cabitoonan. The Villa is part of the glamping resort with pool. It boasts an open planning of Living, Dining and Kitchen area. With its unique green exterior finish, the villa blends with the environment, the shape of the roof also mimics the waves. The villa offers a loft that gives you a magnificent view of the ocean and the whole glamping development.

Resort Pool in General Luna

Started Date: April 2019

Completion: July 2019

what3words location: ///unlocking.glassful.hulking

Completed

Project Description

40 Square meter swimming pool in an existing resort with an infinity pool design and using salt chlorination for a better experience for resort guests. Design included a wall water feature and wood decking. Online reviews of this resort improved once the pool was completed. An added feature was the connection of a fire hose to the pool that can draw pool water in case of a fire in the resort.

Pacific Cross

Started Date:

Completion:

Completed

Project Description

We are creating this writeup. Please check back again soon.